PGCB Job Circular 2024 | pgcb.teletalk.com.bd

PGCB Job Circular 2024: Power Grid Company of Bangladesh (PGCB) Limited has released the recruitment circular for the direct recruitment of manpower for the following vacancies. The organization will employ a total of 163 people in 04 posts. Interested candidates can apply online. Both men and women can apply for the posts. Full notification details (PGCB Job Circular 2024) are given.

Bangladesh Railway Job Circular 2024

Power Grid Company Of Bangladesh LTD Job Circular 2024

Post Name: Junior Accounts Assistant
Number of Posts: 05.
Educational Qualification: BBA/BBS Degree in Accounting/Finance/Finance & Banking/AIS.
Pay Scale: 23,000 Tk.

Post Name: Junior Administrative Assistant
Number of Posts: 04.
Educational Qualification: Bachelor’s Degree or equivalent.
Pay Scale: 23,000 Tk.

Post Name: Technical Assistant (O&M)
Number of Posts: 150
Educational Qualification: Passed SSC (Vocational)/ Dakhil (Science)/ SSC (Science) in relevant subject.
Pay Scale: 14,500 Tk.

Post Name: Office Assistant
Number of Posts: 04.
Educational Qualification: Passed SSC/Dakhil/Equivalent Examination.
Pay Scale: 14,500 Tk.

Application Start Time:07 July 2024 from 10:00 AM onwards.
Application Deadline:Applications can be submitted up to 11:59 PM on 31 July 2024.

Application Process:All candidates have to apply online through http://pgcb.teletalk.com.bd website.

DSS job circular 2024

Image

Power Grid Company Of Bangladesh LTD

Overview: The Power Grid Company of Bangladesh Limited (PGCB) is a government-owned enterprise responsible for the transmission of electricity throughout Bangladesh. Established in 1996, PGCB plays a critical role in the country’s power sector, ensuring the stable and efficient distribution of electricity from power plants to various distribution networks.

History and Formation: PGCB was formed as part of the unbundling and restructuring of the Bangladesh Power Development Board (BPDB) to improve efficiency and management in the power sector. The primary objective was to separate the generation, transmission, and distribution functions to facilitate better management and accountability.

Functions and Responsibilities:

  • Transmission Network Management: PGCB operates and maintains the high-voltage transmission network that connects power generation plants to distribution companies. This includes both overhead lines and underground cables.
  • System Operation: It is responsible for the load dispatch and balancing of electricity supply and demand across the grid to ensure a stable power supply.
  • Grid Expansion and Upgradation: PGCB is tasked with expanding and upgrading the transmission network to meet the growing demand for electricity and to integrate new power plants into the grid.
  • Grid Interconnections: The company works on establishing and maintaining interconnections with neighboring countries for cross-border electricity trade, enhancing regional energy security.

Key Projects and Initiatives:

  • Grid Expansion Projects: PGCB undertakes various projects to expand the transmission network, including the construction of new substations and transmission lines.
  • System Upgradation: Projects aimed at modernizing the grid with advanced technologies to improve efficiency and reliability.
  • Cross-Border Interconnections: Initiatives to strengthen cross-border transmission lines with India and other neighboring countries to facilitate power exchange.

Challenges and Future Plans:

  • Infrastructure Development: Continuous need for investment in infrastructure to keep pace with the growing demand for electricity.
  • Technology Integration: Adoption of smart grid technologies to enhance operational efficiency and grid stability.
  • Renewable Energy Integration: Ensuring the grid is capable of integrating an increasing share of renewable energy sources, such as solar and wind power.
  • Capacity Building: Enhancing the skills and capabilities of the workforce to manage and operate an increasingly complex power grid.

Conclusion: The Power Grid Company of Bangladesh Limited (PGCB) is pivotal to Bangladesh’s power sector, ensuring the efficient transmission of electricity across the country. Through continuous expansion, modernization, and strategic planning, PGCB aims to support the nation’s economic growth and improve the quality of life for its citizens by providing a reliable power supply.

Scroll to Top